Jervois Global Limited

Highlights:

 

  • Idaho Cobalt Operations (“ICO”) project construction continues in line with Jervois’ updated schedule and cost announced in December 2021 

 

  • First drill bay delivered to site; ICO underground in-fill drilling due to commence  in Q1 2022 

 

  • US$1.2 million campaign is anticipated to deliver 5,800 metre in-fill drilling by Q4 2022  

 

  • Campaign will decrease drill hole spacing to enhance ore body knowledge, robustness of Mineral Resource and Reserve Estimates, and will be used to underpin and derisk initial mining, expected from Q3 2022.  

 

  • Planning is also underway with respect to both surface and underground drill programmes, to be completed during 2022, that will be focused on resource expansion beyond the limits of the current ICO mineral resource  

 

  • Once commissioned, ICO will be the only mine supply of cobalt in the United States, a critical metal necessary for industry, defense, electric vehicles and energy generation and distribution in a carbon constrained economy 

 

TheNewswire – 31 January 2022 – The Board of Directors of Jervois Global Limited (“Jervois”) (ASX:JRV) (TSXV: RV) (OTC:JRVMF) has approved an initial in-fill drill programme at Idaho Cobalt Operations (“ICO”) in Idaho, United States, commencing in Q1 2022.

 

During 2022, Jervois is planning a drill programme from both above and below ground.  The initial underground section of this plan is to improve the robustness of the resource model that will be generating a production block model for mining start up later this year.  Planning is also underway to determine what resource extension targets can be drilled from underground positions.  

 

Jervois has committed US$1.2 million to complete approximately 5,800 metres of underground drilling at its RAM deposit within ICO.  The in-fill drilling campaign across 2022, will reduce drill hole spacing in the underground resource ahead of first production later this year.  Underground drilling is expected to commence later in Q1 2022.

 

Whilst not part of this initial approval, Jervois’s team at ICO is also planning a resource expansion drill programme from surface between April to November 2022, when site conditions permit.  Expansion of the resource is important if ICO is to operate for longer than its initial mine life, or at higher production rates than contained in the ICO Bankable Feasibility Study.  The RAM deposit remains open at depth, and Jervois has confidence that there exists a strong potential of resource and reserve expansion.  Further details on this additional programme will be advised once finalized and approved by Jervois’s Board later in Q1 2022.

 

Small Mine Development (“SMD”), a regional underground mining contractor engaged at ICO, continues below surface development.  Construction is on schedule and the first underground drilling bay was delivered during the month of January.  

 

First ore at ICO is anticipated for August 2022 and Jervois expects to reach sustainable commercial production from December 2022.

 

On behalf of Jervois

 

Bryce Crocker, CEO

 

For further information, please contact:

 

Investors and analysts:

James May

Chief Financial Officer

Jervois Global Limited

[email protected]

Media:

Nathan Ryan

NWR Communications

[email protected]

Mob: +61 420 582 887

         

Forward-Looking Statements

 

This news release may contain certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”, “forecast”, “may”, “schedule”, “expected” and other similar words or expressions identify forward-looking statements or information. These forward-looking statements or information may relate to the timing construction activities at ICO, the timing of productions at ICO, the timing of the drill programme and outcomes from such drill programme, and certain other factors or information. Such statements represent Jervois’ current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by Jervois, are inherently subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. Jervois does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affections such statements and information other than as required by applicable laws, rules and regulations.

 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

         

Copyright (c) 2022 TheNewswire – All rights reserved.